Rosa Parks Elementary Boiler & Chiller Replacement

Indianapolis, Indiana

RQAW | DCCM led the significantly advanced comprehensive HVAC system upgrade for the Rosa Parks Elementary School. This initiative was carefully phased to align with the academic calendar and minimize disruption to school operations. The cooling system was replaced over spring break, ensuring the facility was prepared for warmer weather, while the heating system was completed during summer break to support the upcoming school year.

The project included the installation of three high-efficiency boilers, two high-capacity chillers, and a fully modernized Building Management System (BMS), providing facility staff with improved control and visibility over operations. Delivered through a design-bid-build approach, the project leveraged multiple manufacturers and flexible alternates to maximize value within budget constraints. The result is a high-performance, future-ready HVAC system that advances sustainability goals and supports student success.

Scroll to Top